Indcresa
INDCRESA Terrassa, Spain Implementation of the company’s new general laboratory. Area: 125 m². Year: (2022)
1 / 5
INDCRESA
Terrassa, Spain
Indcresa General Laboratory, Terrassa
Description:
Implementation of the company’s new general laboratory.
Area: 125 m².
Year: 2022
Execution of all work required to implement the company’s new general laboratory within its new corporate building. Based on the existing structure, the project was carried out in accordance with the executive design (Lab Planning), encompassing all components of the laboratory:
- HVAC, air handling units (AHUs), and ductwork.
- Electrical and plumbing/sanitation systems.
- Horizontal and vertical partitions.
- Laboratory furniture.
- Communications.
- Fire protection.
- Civil works, flooring, and structural provisions for duct routing.
- Communication and integration of various control systems with the building’s existing infrastructure.
Engineering services for the development of a comprehensive executive design for the new general laboratory.
Area: 125 m².
Year: 2021
Engineering and Lab Planning services for the new general laboratory in Terrassa, covering the design and planning of the following components:
- HVAC, air handling units (AHUs), and ductwork.
- Electrical and plumbing/sanitation systems.
- Horizontal and vertical partitions.
- Laboratory furniture.
- Communications.
- Fire protection.
- Civil works, flooring, and structural provisions for duct routing.
- Communication and integration of various control systems with the building’s existing infrastructure.
Terrassa, Spain
Indcresa General Laboratory, Terrassa
Description:
Implementation of the company’s new general laboratory.
Area: 125 m².
Year: 2022
Execution of all work required to implement the company’s new general laboratory within its new corporate building. Based on the existing structure, the project was carried out in accordance with the executive design (Lab Planning), encompassing all components of the laboratory:
- HVAC, air handling units (AHUs), and ductwork.
- Electrical and plumbing/sanitation systems.
- Horizontal and vertical partitions.
- Laboratory furniture.
- Communications.
- Fire protection.
- Civil works, flooring, and structural provisions for duct routing.
- Communication and integration of various control systems with the building’s existing infrastructure.
Engineering services for the development of a comprehensive executive design for the new general laboratory.
Area: 125 m².
Year: 2021
Engineering and Lab Planning services for the new general laboratory in Terrassa, covering the design and planning of the following components:
- HVAC, air handling units (AHUs), and ductwork.
- Electrical and plumbing/sanitation systems.
- Horizontal and vertical partitions.
- Laboratory furniture.
- Communications.
- Fire protection.
- Civil works, flooring, and structural provisions for duct routing.
- Communication and integration of various control systems with the building’s existing infrastructure.