Givaudan
Sant Celoni, Spain Renovation for the complete implementation of the new R&D laboratory for Creations and Flavors. m²: 220. Year: (2020)
1 / 4
Givaudan
Sant Celoni, Spain
R&D Laboratory for Creations and Flavors, Sant Celoni
Description:
Renovation for the complete implementation of the new R&D laboratory for Creations and Flavors.
m²: 220.
Year: (2020)
Execution of all work packages required for the implementation of the new R&D laboratory in Sant Celoni. Based on the existing structure, and following the executive project (Lab Planning), all components of the laboratory were constructed, including:
– Removal of existing furniture.
– Demolition and removal of partitions.
– HVAC, air handling units (AHU), and ductwork.
– Technical gases.
– Electrical and plumbing/sanitation installations.
– Horizontal and vertical partitions.
– Furniture.
– Communications.
– Fire protection.
– Civil works, flooring, and structural provisions for duct routing.
– Integration of various control systems with the building’s existing infrastructure.
Engineering services for the development of an executive project for the complete renovation of the R&D laboratory for Creations and Flavors.
m²: 220.
Year: (2019)
Engineering and Lab Planning services to produce a turnkey executive project, aimed at renovating the designated area, adapting it to current and future requirements, and optimizing workflows. This project includes:
– HVAC, air handling units (AHU), and ductwork. Electrical and sanitation installations; horizontal and vertical partitions; furniture.
– Communications.
– Fire protection.
– Civil works, flooring, and provisions for duct routing.
– Communication and integration of the various control systems with the building’s own systems
Sant Celoni, Spain
R&D Laboratory for Creations and Flavors, Sant Celoni
Description:
Renovation for the complete implementation of the new R&D laboratory for Creations and Flavors.
m²: 220.
Year: (2020)
Execution of all work packages required for the implementation of the new R&D laboratory in Sant Celoni. Based on the existing structure, and following the executive project (Lab Planning), all components of the laboratory were constructed, including:
– Removal of existing furniture.
– Demolition and removal of partitions.
– HVAC, air handling units (AHU), and ductwork.
– Technical gases.
– Electrical and plumbing/sanitation installations.
– Horizontal and vertical partitions.
– Furniture.
– Communications.
– Fire protection.
– Civil works, flooring, and structural provisions for duct routing.
– Integration of various control systems with the building’s existing infrastructure.
Engineering services for the development of an executive project for the complete renovation of the R&D laboratory for Creations and Flavors.
m²: 220.
Year: (2019)
Engineering and Lab Planning services to produce a turnkey executive project, aimed at renovating the designated area, adapting it to current and future requirements, and optimizing workflows. This project includes:
– HVAC, air handling units (AHU), and ductwork. Electrical and sanitation installations; horizontal and vertical partitions; furniture.
– Communications.
– Fire protection.
– Civil works, flooring, and provisions for duct routing.
– Communication and integration of the various control systems with the building’s own systems